The diagram illustrates the process that is used to manufacture bricks for the building industry, digger (т40 grid wire cutter day coder cooling chamber drying oven 18 * 72 Are Might 870°C • 1309°C 200°0 • 960°C packaging
This diagram illustrates the 2 different ways of how electricity is being produced from sea waves. The process requires the construction of a large chamber connected to a column with a turbine