The given map compares the prior layout and the
overall
changes of the museum after 3 years Linking Words
construction
, between 2010 and 2013. In general, it is evident that the museum is modernised with improved infrastructure and enlarged territory.
In 2010, there was a garden and a main building, where 6 amenities Change preposition
of construction
served
Verb problem
were served
there
. In detail, Rephrase
apply
ticket
desk was placed between Correct article usage
the ticket
an
entrance and Correct article usage
the
a
lobby, before entering the main observation area. An ocean hall was the first attraction of the museum, and a mammal corner Correct article usage
the
in
the Change preposition
on
left-side
, Use the right word
left side
while
Linking Words
dinosaur
gallery was situated below that second object. Correct article usage
the dinosaur
In addition
, the green space was covered Linking Words
in
the right-hand Change preposition
on
of
the building.
After 3 years, the constructed territory increased in size Check wording
side of
to
the right direction and 5 new amenities were installedChange preposition
in
,
Punctuation problem
;
consequently
, the garden was completely diminished. The new building had a shop, a cafe, a human origins display, and the mammal observation was moved there. Two latest displays, an ice age and an insectarium, had Linking Words
also
been installed in the prior area, right in the old mammal site.Linking Words