The diagram describes the process of creating a depository using concrete canvas,which includes eight stages, involving vans, advanced machinery and a manual workforce.
To begin
with, bricks should be manufactured. These bricks consist of dry concrete covered with a fibrous top surface and a waterproof layer underneath. Linking Words
Then
, they are delivered by vans for Linking Words
further
unwrapping. Linking Words
After
Linking Words
this
, unwrapped material is spread on the ground using pegs and rope attached to the car at a length of ten metres. Linking Words
Following
Linking Words
this
, the air is pumped inside with a special air pump, creating space and a door. Linking Words
This
stage takes place underground. The sixth stage involves a worker,who is watering the future warehouse, creating an eight-metre height building Linking Words
as a result
. Storehouse needs 20-24 hours for setting. The final picture describes the process of storing itself.
Linking Words
To sum up
, constructing storage from concrete canvas is a multistage method, which requires complex machinery, human resources, vans, cars and specific raw materials.Linking Words
annaosmatesko