The maps compare the layout of a
school
as it was in the year 2004 with a proposed site design for the year 2024.
Use synonyms
Overall
, the main change for 2024 involves the appearance of a new Linking Words
school
building. The Use synonyms
school
will Use synonyms
then
be able to accommodate a considerably large number of students.
In 2004, there were 600 pupils attending the Linking Words
school
, and the two buildings were separated by a path running from the main entrance to the sports field. By 2014, it is expected that there will be 1000 pupilsUse synonyms
,
and a third building will have been constructed on the original site of the sports field. Remove the comma
apply
In addition
, the path will have been
shortened in order to connect it to the two original buildings, which will have been linked.
A second Linking Words
car
Use synonyms
park
will be built next to the third building, and the sports field with a smaller area will be relocated to the south of the Use synonyms
car
Use synonyms
park
in 2024. A new road Use synonyms
also
will be built from the main entrance to the second Linking Words
car
Use synonyms
park
. Use synonyms
Finally
, there will be no changes to the original Linking Words
car
Use synonyms
park
and the main entrance.Use synonyms
nttung.182