The diagram below show the site of a school in 2004 and the plan for the changes to the school site in 2024
The first picture depicts the layout of the
school
site in 2004, and the second picture illustrates some proposed changes in 2024.
As shown in the figures, in 2004, the school
accommodated 600 students. At that time,located in the north were the two school
buildings, with the sports field situated to the east of the two school
buildings.
By 2024, the student population is projected to reach 1,000, with plans for school
Building 1 to have accessibility to Capitalize word
School
school
Building 2. Capitalize word
School
Additionally
, a third building is planned for construction to the east of the existing school
buildings, replacing the sports field, which is planned to relocate eastward of
Building 2.As can be seen,the size of the sports field is planned to contract. Car Park 2 is Change preposition
from
also
planned to be positioned to the right of Building 3, with another new road alongside Building 2.
Overall
, significant changes can be identified after
this
expansion; however
, the southern area of the school
remains similar in both pictures.Submitted by zora840810 on
Unauthorized use and/or duplication of this material without express and written permission from this site’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Writing9 with appropriate and specific direction to the original content.
Introduction: The introduction is missing.
▼
Introduction: The chart intro is missing.
▼
Introduction: The chart intro is missing.
▼
Vocabulary: Replace the words school with synonyms.
▼
Vocabulary: Rephrase the word "changes" in your introduction.
▼
Vocabulary: The word "changes" was used 2 times.
▼