The given map demonstrates plans for future developments in the southwest airport in the year ahead.
Overall
, Linking Words
it is clear that
the airport will change a lot in a year, and a lot of services will be built. Linking Words
Also
, it is apparent that there will be more Linking Words
gates
and the concourse will be designed to be Y-shaped.
For the departures side, check-in will be relocated to the right side of the lobby and a bag drop will be built in its former position. Use synonyms
Moreover
, there will be two entrances Linking Words
instead
of one, and right next to the Linking Words
gates
, a new cafe will be developed. Use synonyms
In addition
, shops will be found right after walking past the security.
For the arrivals, Linking Words
on the other hand
, there will be a cafe built on the left just after passing the customs. Linking Words
Furthermore
, an ATM will be found beside it and car-hiring services will be developed next to the two exit Linking Words
gates
. Use synonyms
Additionally
, the walkway will be replaced by a sky train and there will be 18 Linking Words
gates
available Use synonyms
instead
of 8 for boarding.Linking Words
ahmedhany98