The given maps illustrate a museum's floor plan after a renovation from 2008 to 2012.
Overall
, over the period, the building underwent dramatic changes Linking Words
such
as 2 floors being added, the lift being located, and the Cloakroom being relocated.
As can be seen, in 2008, a path was in the west of the museum that connected to the entry, just before the reception which was built next to the reading area. Linking Words
Moreover
, the gallery and changing room were situated under the entrance and reading place respectively. Linking Words
In addition
, the shop and stairs had built between them.
After the development in 2012, the location and size of the path, gallery, shop and reading place did not change. The reception was rebuilt to reduce its size and merged with the cloakroom . Linking Words
Furthermore
, where the children's play area and entrance hall stand, there used to be a changing room and entry. It is Linking Words
also
worth mentioning that the stairs were destroyed to make way for a lift which climbs to the 4th floor. Linking Words
In addition
, a new restaurant, terrace and self-service cafe were constructed on the right and left of the lift respectively. Linking Words
Also
, a new exhibition area was set up above the self-service cafe.Linking Words
smksalati