The maps show improvements that have been made to a university campus between 2010 and the present day. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.
The two maps inform university area development from 2010 to the present time.
Overall
, changes have been made in several buildings
, facilities, infrastructures, and public amenities.
In 2010, only two student accommodations were provided by the university, but in recent times, two other buildings
have been added, besides
the older buildings
in the west of the lake
and one in the old restaurant building. The new student accommodation building in the east of the lake
has been embellished by a street, Other buildings
in the south of the lake
have been improved and changed to be a student facilities building, including shops and offices.
The teaching block for art and science in 2010, had been improved and separated during the improvement, The science building is opposite the initial place in 2010, and the arts is in the initial place with a renovation occured. The lawn and seating, shops and restaurants in the vicinity of the lake
have been demolished.Submitted by misstiasclassroom on
Unauthorized use and/or duplication of this material without express and written permission from this site’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Writing9 with appropriate and specific direction to the original content.
Vocabulary: Replace the words buildings, lake with synonyms.
▼
Vocabulary: Only 6 basic words for charts were used.
▼
Vocabulary: The word "changes" was used 2 times.
▼
Vocabulary: The word "improved" was used 2 times.
▼