The diagrams below show the site of a school in 2004 and the plan for changes to the school site in 2024.
The maps illustrate the change of a
school
in 2004 and how to renovate it in 2024.
Overall
, it is clear that
the number of students will increase in 20 years, so there is a new school
building which will be constructed.
To begin
with, there was a path connecting the main entrance and the sports field; however
, the connecting road will be built from the first school
building to the second
school
building, so a part of the sidewalk will be removed. In addition
, the sports field will be changed to the third school
building, and the second
car park will be built on the east of it. This
change leads some trees to be knocked down.
Moreover
, there will be a road connecting the main entrance and the second
car park which will be constructed behind the second
school
building in 2024. Therefore
, the sports field will become smaller and be removed to the southern of the second
parking lot. On the west of the map, the road, first parking lot and main entrance have been located in the same place until 2024.Submitted by af231186 on
Unauthorized use and/or duplication of this material without express and written permission from this site’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Writing9 with appropriate and specific direction to the original content.
Vocabulary: Replace the words school, second with synonyms.
▼
Vocabulary: Only 6 basic words for charts were used.
▼
Vocabulary: The word "maps" was used 2 times.
▼
Vocabulary: The word "change" was used 3 times.
▼