The diagrams below show the site of an airport now and how it will look after redevelopment next year.
The maps depict an airport at the present time and its transformations after renovation in the next year.
Overall
, It can be seen that many facilities are going to be added. Also
, some areas will be unchanged during this
period.
First of all, the location of the old security passport
control
and passport
control
customs sections will remain unchanged. The check-in area
will be relocated from northwest to northeast of the security passport
control
sector in place of the cafe. Moreover
, the café will be situated in the northeast of passport
control
customs. Also
, a wide variety of facilities such
as an ATM machine, a sky train, a car hire station and a bag drop area
will be added in the airport. The walkway which is located in the north of the airport will be demolished and the expansion of this
area
will provide 10 more gates. The departure and arrival doors in the entrance area
will be doubled next year.Submitted by maryam.nutrition1988 on
Unauthorized use and/or duplication of this material without express and written permission from this site’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Writing9 with appropriate and specific direction to the original content.
Linking words: Don't use the same linking words: "also".
▼
Vocabulary: Replace the words passport, control, area with synonyms.
▼
Vocabulary: Rephrase the word "undefined" in your introduction.
▼
Vocabulary: The word "unchanged" was used 2 times.
▼