This
diagram illustrates the steps involved in the production of power from hydroelectricity.
Linking Words
Overall
, Linking Words
this
process consists of three phases, the first phase takes place naturally, the second involves the use of a Linking Words
turbine
and the third phase occurs in the transformer station before being delivered for use.
Use synonyms
Initially
, Linking Words
water
from the sea evaporates in the presence of the sun. Use synonyms
This
Linking Words
water
vapour Use synonyms
then
condenses to form clouds, later these clouds lose Linking Words
this
Linking Words
water
in the form of rain. The released Use synonyms
water
from the clouds is harvested in a reservoir which is controlled by a dam. With regard to the second stage, the collected Use synonyms
water
passes through a valve which can be opened or closed Use synonyms
according to
the requirements, before being channelled through a Linking Words
turbine
. It is at Use synonyms
this
point in the process Linking Words
when
hydroelectricity is generated. Correct word choice
that
This
hydroelectricity is transferred to a transformer station via high-voltage cables. The Linking Words
water
used to turn the Use synonyms
turbine
is returned to the reservoir by a pump.
In the third phase, the energy produced by the Use synonyms
turbine
is received by the transformer station which regulates the energy and transforms it into a useable form of electricity. Use synonyms
Finally
, the newly generated electricity is distributed to houses, factories and hospitals or schools with the help of underground cables.Linking Words