The maps below show an industrial area in the town of Norbiton, and planned future development of the site
The maps below illustrate an industrial area in the town of Norbiton
,
and its future perspectives after reconstruction. Remove the comma
apply
Overall
, reforming the territory is anticipated to change Norbiton completely and make the city transform into a residential area.
According to
today’s map, it is clear that
the centre of the town is surrounded only by factories. The landmark is known as an industrial place today. Doubtless, the river which is situated in the north part of the city and divides it into two parts has no any boons for industry.
New facilities are expected to be built in the centre of Norbiton in the future. It is planned to set up shops, medical centres, playgrounds and schools instead
of factories. New houses are going to be constructed over the river in the northern part. Dividing the river into two parts by the housing will make the site more attractive and modern. The place of farmland is expected to change from north to east.Submitted by checkmyessay9 on
Unauthorized use and/or duplication of this material without express and written permission from this site’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Writing9 with appropriate and specific direction to the original content.
Vocabulary: Only 5 basic words for charts were used.
▼
Vocabulary: The word "maps" was used 2 times.
▼
Vocabulary: The word "change" was used 2 times.
▼