The maps below describe an area before and after the construction of a hydroelectric power plant. Summarize the information by selecting and reporting the main features and make comparisons where relevant.
The diagrams illustrate the transformation of a hydroelectric power plant
of
a specific place before and after.
Change preposition
in
Overall
, the area witnessed a significant change, including additional space and the introduction of new facilities.
Before development, the river Linking Words
running
from north to south, in the middle between the forest on the left and the mountains on the right. Wrong verb form
ran
Moreover
, on the east of the mountains was a farm building, Linking Words
provided
water from the river to maintain the industrial process Correct pronoun usage
that provided
and
Correct word choice
apply
oppsite
Correct your spelling
opposite
with
the village. To go through the river, a littleChange preposition
apply
brigde
was built Correct your spelling
bridge
and
leading to Correct word choice
apply
historic
castle at the bottom on the left-hand and right behind the national park.
After changing, a hydroelectric dam was built at the center of the picture andCorrect article usage
a historic
coverted
into a lake Correct your spelling
covered
in
the north side,Change preposition
on
whares
Correct your spelling
where
forest
and mountains remained the same. Fix the agreement mistake
forests
Furthermore
, farmland was replaced by a hotel, Linking Words
while
the village and bridge stayed Linking Words
at
the first place. Change preposition
in
In addition
Linking Words
to
, both Change preposition
apply
castle
which bring historical Fix the agreement mistake
castles
values
and Fix the agreement mistake
value
national
park wereCorrect article usage
the national
contructed
, adding a power plant and three transmission towersCorrect your spelling
constructed
surround
.Verb problem
apply
document.hanie