The picture flow of sand and water is added, after mixing through a wire cutter or mould.
This
step involves driving the oven for 24- 48 hrs, Linking Words
next,
baking through two kilns at different temperatures, before cooling Linking Words
chamber
for 48 – 72 hrs and packing. Correct article usage
the chamber
Finally
, blicks are delivered.
The chart illustrates information about the steps and equipment involved in the production of bricks for the building industry.
Linking Words
Overall
, looking at the picture closely, the process has multiple different stages starting from digging the clay and ending with delivering to distributors Linking Words
to
the building industry.
Change preposition
in
Firstly
, the making of bricks process begins when the digger takes clay. Linking Words
Then
, it is placed on a metal grid where it is passed through a roller into smaller pieces. After that, the Linking Words
blick
Check wording
bill
are
delivered.Correct subject-verb agreement
is