The maps compare two different underpass systems for cars in Australia in two different cities.
Overall
, there are a number of differences between the two Linking Words
tunnel
systemsUse synonyms
,
in terms of cost, size, length, time of reconstruction, and the surrounding environment. The Punctuation problem
apply
first
Use synonyms
tunnel
was significantly smaller by size than the second Use synonyms
tunnel
.
The Use synonyms
first
Use synonyms
tunnel
, which took twelve years from 1986 to 1998, cost $555 millionUse synonyms
,
and was built underneath a body of water and sand. Meanwhile, the second Remove the comma
apply
tunnel
only took 4 years from 2002 with the cheapest cost at only $1,1 million, and was constructed beneath a layer of stone and clay.
Use synonyms
Furthermore
, there are substantial differences by size, with the Linking Words
first
Use synonyms
tunnel
being 1.5 meters high and 2.2km long and the underpass being 2.5, high and 3.6 km long. Use synonyms
In addition
, the Linking Words
first
runner system is four lanes wide, Use synonyms
while
the underpass system is six lanes wideLinking Words