The given diagrams provide information about the main features of two road tunnels, which are located in two Australian cities.
Overall
, Linking Words
it is clear that
Linking Words
tunnel
B is significantly longer and deeper than Use synonyms
tunnel
A, and it was constructed more recently at almost twice the cost.
Observing Use synonyms
tunnel
A in detail, it was built between 1987 and 1992 at a cost of $556 million. It is 2.2 kilometres long and reaches a maximum depth of 25 metres. Use synonyms
Besides
Linking Words
that
the Add a comma
that,
tunnel
passes through a body of water , and it is constructed with a support of sand, clay, and concrete.
Turning to Use synonyms
Tunnel
B, it was constructed between 2004 and 2007, costing $1.1 billion. Use synonyms
Furthermore
, at 3.6 kilometres longer than Linking Words
tunnel
A and reaches 35 metres below. Unlike Use synonyms
tunnel
A, it is built with rock and runs beneath the city rather than a body of water.Use synonyms