The plans show how the theatre changed over 2 years (2010-2012). Overall, the size of the amphitheater remains unchanged, while the size of the stage has increased. Finally, the cafe is gone with the ticket station ,taki
The two maps illustrate the layout of a theatre in 2010 and how it was redesigned in 2008. Overall, the stage space was enlarged and several facilities, such as a restaurant and a corridor, were introduced to improve th
The maps illustrate the changes that took place in a cinema from 2010 to 2012. Overall, the theatre was expanded with better infrastructure and more rooms and facilities for residents over a period of 2 years.
The maps represent the layout of a small theatre in 2010 and two years later. Overall , a mini theatre has used its side space by extending and adding rooms to it. In addition, they have replaced a cafe with a restaurant
The maps represent the layout of a small theatre in 2010 and two years later.Overall , a mini theatre has used its side space by extending and adding rooms to it. In addition, they have replaced a cafe with a restaurant.