In the first step, we excavate the raw material with a digger, bringing the clay over a metal grid to get all the big stuff out and from there the material goes with the conveyor belt 
further
 along, sand and water get mixed with it. The mixture is Linking Words
then
 cut with the wire cutter or put in Linking Words
molds
 to form the Change the spelling
moulds
bricks
.
Use synonyms
The next step is
 the drying oven where the Linking Words
bricks
 rest for one to two days. After that, Use synonyms
bricks
 get heated up between 200 and 900 degrees Celsius, followed by high heat with 870-1300 degree Celsius. When the heating process is finished, they will sit in the cool room for up to 3 days.
In the Use synonyms
last
 step, Linking Words
bricks
 get packed on pallets and get moved in the delivery truck to reach the destination, where they are going to the warehouse or to the customer.Use synonyms