The Flowchart shows the steps
how
the Change preposition
of how
bricks
are made for the building industry.
Use synonyms
Overall
, there are 7 steps and it begins with the digger machine Linking Words
to collocate
the clay and Change the verb form
collocating
end
with the delivery process.
The first step Correct subject-verb agreement
ends
to
Add a missing verb
is to
dig
the clay Change the verb form
digging
by
the help of the digger and put the clay Change preposition
with
to
the metal grid roller to roll and Change preposition
on
then
mix sand plus water to make a paste. Linking Words
This
paste Linking Words
Add a missing verb
is use
use
Replace the word
used
to
ways, one is Correct your spelling
two
wire
cutter Correct article usage
a wire
or
another way is mould to Correct word choice
and
made
the Change the form of the verb
make
bricks
in shape. After toward, the Use synonyms
bricks
need to be Use synonyms
putted
in the dying oven for 24-48 hours which is almost 2 days.
The process continues with the Correct your spelling
put
bricks
being fried in the kiln at Use synonyms
the
moderate temperature of 200 to 980 Celsius degree. After that, they are heated under Correct article usage
a
the
higher temperature of up Correct article usage
a
1300
Celsius degree before being cooled for 2 or 3 days. In the next and very Change preposition
to 1300
last
Linking Words
stage
, the Fix the agreement mistake
stages
bricks
are packaged. The whole process concludes with the delivery of the Use synonyms
bricks
to the customers.Use synonyms
englishpills077