The maps below show an industrial area in the town of Norbiton, and planned future development of the site. Summerise the information by selecting and reporting the main features, and make comparisons where relevant.

The maps below show an industrial area in the town of Norbiton, and planned future development of the site. 

Summerise the information by selecting and reporting the main features, and make comparisons where relevant.
The maps illustrate how the town of the Norbiton
area
will be developed
according to
the plan.
Overall
,
it is clear that
more roads will be constructed for easy access.
In addition
, factories will be replaced by housing in order to draw new residents. First of all, a new bridge will be available, which future dwellers can directly go to the town's north part, where farmland is located across the river.
Moreover
, roads will be made to the northwest and the southern part of the
area
. There will be another circled road on the southern road, which connects with the big circled road in the middle.
Next,
factories currently located in the
area
will be replaced by a number of newly built houses.
This
allows families to live in the new
area
,
therefore
new facilities for residents will be
also
constructed in the centre of the town including shops, medical centre, school and playground.
Submitted by 98shs on

Unauthorized use and/or duplication of this material without express and written permission from this site’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Writing9 with appropriate and specific direction to the original content.

Basic structure: Change the third paragraph.
Vocabulary: Replace the words area with synonyms.
Vocabulary: Only 3 basic words for charts were used.
Vocabulary: Use several vocabularies to present the data in the second paragraph.
Vocabulary: Use several vocabularies to present the data in the third paragraph.
What to do next:
Look at other essays: