The diagrams below show the present building of a college and the plan for changes to the college site in the future
The given map depicts the current condition of the college building and its improvement plan for 2020.
Overall
, it can be seen that there were drastic changes on the outside and inside college buildings in 2020 compared to the present.
Looking into detail, it is apparent that, in 2020, the small area of the car park on the west would have been constructed into a large area, so students, Linking Words
as well as
the lecturers, would have more space. Linking Words
Similarly
, there were no roads Linking Words
due to
the development of some public places. Linking Words
Likewise
, at present, the garden located in the north of the map would have been replaced by shops, a toilet, and a classroom. Linking Words
However
, the road and bus stop situated on the south of the map would still exist until 2020.
Linking Words
Furthermore
, in terms of the inside building, there were more classrooms would have been added in 2020 and Linking Words
also
the position of the main entrance would have been replaced to the south of the building. Linking Words
In addition
, the reception office would have been put in the centre of the building near the library. Linking Words
Nevertheless
, there would be no changes to the lunch area in the future.Linking Words
Submitted by ieltscuns2022 on
Unauthorized use and/or duplication of this material without express and written permission from this site’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Writing9 with appropriate and specific direction to the original content.
Vocabulary: The word "map" was used 3 times.
▼
Vocabulary: The word "present" was used 2 times.
▼
Vocabulary: The word "changes" was used 2 times.
▼