The diagrams below give information about two road tunnels in two Australian cities. Summarize the information by selecting and reporting the main features and make comparisons where relevant.

The diagrams below give information about two road tunnels in two Australian cities. Summarize the information by selecting and reporting the main features and make comparisons where relevant.
The diagrams show information about two lanes built in two different cities in Australia. The first
road
tunnel
project was begun construction in 1986 and
fufilled
Correct your spelling
fulfilled
in 1998. It was built under the
river
and connected with two heads of the
river
bank. Construction engineers used sand to separate the
river
and the
tunnel
.
This
was
deeply
Change the word
deep
show examples
about 1.5 metres and stretched 2.2 kilometres. It just had four lanes for cars and the cost which
contractor
Correct article usage
the contractor
show examples
had to pay was $555 million. The next
tunnel
was built under the
road
in the city. It
tooks
Correct your spelling
took
4 years to finish
this
project from 2002 to 2006. That
tunnel
was wider than the
tunnel
under the
river
.
Hence
, it
costed
Correct your spelling
cost
show examples
more than that of
tunnel
about $1.1 billion and
also
had six lanes for means of
transports
Fix the agreement mistake
transport
show examples
. The depth was about 2.5 metres and the length of
this
road
lasted 3.6 kilometres. They used some materials
such
as stone and clay to build it.
Overall
, we can see that the second
tunnel
took less time
the
Change preposition
than the
show examples
first one,
although
the cost that they had to pay
more
Add a missing verb
was more
show examples
expensive but it was more quality than the first
road
tunnel
.
Submitted by vuhien4397 on

Unauthorized use and/or duplication of this material without express and written permission from this site’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Writing9 with appropriate and specific direction to the original content.

Vocabulary: Replace the words road, tunnel, river with synonyms.
Vocabulary: Rephrase the word "information" in your introduction.
Vocabulary: Only 4 basic words for charts were used.
Vocabulary: The word "about" was used 4 times.
Vocabulary: Use several vocabularies to present the data in the fourth paragraph.
Topic Vocabulary:
  • urban infrastructure
  • commuter
  • traffic congestion
  • toll collection system
  • vehicular capacity
  • bi-directional lanes
  • engineering feat
  • innovative design
  • safety measures
  • construction materials
  • ventilation system
  • emergency exits
  • tunnel clearance
  • inauguration date
  • public-private partnership
  • sustainability features
What to do next:
Look at other essays: