The diagrams show information about two lanes built in two different cities in Australia.
The first
road
Use synonyms
tunnel
project was begun construction in 1986 and Use synonyms
fufilled
in 1998. It was built under the Correct your spelling
fulfilled
river
and connected with two heads of the Use synonyms
river
bank. Construction engineers used sand to separate the Use synonyms
river
and the Use synonyms
tunnel
. Use synonyms
This
was Linking Words
deeply
about 1.5 metres and stretched 2.2 kilometres. It just had four lanes for cars and the cost which Change the word
deep
contractor
had to pay was $555 million.
The next Correct article usage
the contractor
tunnel
was built under the Use synonyms
road
in the city. It Use synonyms
tooks
4 years to finish Correct your spelling
took
this
project from 2002 to 2006. That Linking Words
tunnel
was wider than the Use synonyms
tunnel
under the Use synonyms
river
. Use synonyms
Hence
, it Linking Words
costed
more than that of Correct your spelling
cost
tunnel
about $1.1 billion and Use synonyms
also
had six lanes for means of Linking Words
transports
. The depth was about 2.5 metres and the length of Fix the agreement mistake
transport
this
Linking Words
road
lasted 3.6 kilometres. They used some materials Use synonyms
such
as stone and clay to build it.
Linking Words
Overall
, we can see that the second Linking Words
tunnel
took less time Use synonyms
the
first one, Change preposition
than the
although
the cost that they had to pay Linking Words
more
expensive but it was more quality than the first Add a missing verb
was more
road
Use synonyms
tunnel
.Use synonyms
vuhien4397