There are two planning charts of Southwest Airport which clearly show recent interior structures and redevelopment plans for the airport next year.

There are two planning charts of Southwest Airport which clearly show recent interior structures and redevelopment plans for the airport next year.
There are two planning charts of Southwest
Airport
which clearly show recent interior structures and redevelopment plans for the
airport
next year. There are some changes by comparing two drawings of the
airport
.
Firstly
, it is worth noticing that there is one arrival gate and one departure gate now ,and the number of two gates will increase in the future.
Secondly
, as can be seen in the second picture of the
airport
, there are more passenger services ,
such
as car hire , an ATM and a bag drop.
By contrast
, nowadays , there are only a cafe service and check-in at the
airport
. Next , the biggest change in the
airport
of the future is that there will be more gates which will increase 10 gates by comparing nowadays .
Finally
, getting back to the details of the drawings , we can see that the walkway was closed and the sky train will be used in the next year . In conclusion , there are four obvious changes in
airport
interior design in the future by comparing now.
Submitted by ysh424 on

Unauthorized use and/or duplication of this material without express and written permission from this site’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Writing9 with appropriate and specific direction to the original content.

Vocabulary: Rephrase your introduction. Words match: 100%.
Vocabulary: Replace the words airport with synonyms.
Vocabulary: Rephrase the word "show" in your introduction.
Vocabulary: Rephrase the word "undefined" in your introduction.
Vocabulary: Only 6 basic words for charts were used.
Vocabulary: The word "changes" was used 3 times.
Vocabulary: The word "increase" was used 2 times.
What to do next:
Look at other essays: