The two maps below show the village of Bunborough in the present day and plans for the village in 2024. Summarise the information by selecting and reporting the main features and make comparisons where relevant. Write at least 150 words.

The two maps below show the village of Bunborough in the present day and plans for the village in 2024.

Summarise the information by selecting and reporting the main features and make comparisons where relevant.

Write at least 150 words.
The data illustrates the current state of Bunborough Village
as well as
the renovation plans for 2024.
Overall
, the place is planned to undergo several changes, the biggest ones being the construction of the railway and the development of tourism facilities
such
as hotels. At present, there's only one
road
connecting the village with the main motorway,
however
, in the future, an alternative route is planned to be built to create better access for people travelling to Lynwich. Adjacent to a new
road
,
according to
the proposed plan, there are going to be two hotels constructed on different sides of the river, one close to the newly built promenade in the city, and the other right next to the beach.
Moreover
,
besides
the
road
, a new railway is planned to be built running through the city from south to north.
However
,
such
a big development will cause the movement of two houses to the other side of the
road
, to enable the creation of the railway station. At the moment there are three piers in the fishing port.
According to
the plan, only one of those will remain and a new promenade will be built
instead
.
Submitted by katja.otavina on

Unauthorized use and/or duplication of this material without express and written permission from this site’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Writing9 with appropriate and specific direction to the original content.

Linking words: Don't use the same linking words: "according to, however, such".
Introduction: The introduction is missing.
Introduction: The chart intro is missing.
Introduction: The chart intro is missing.
Vocabulary: Replace the words road with synonyms.
Vocabulary: Only 5 basic words for charts were used.
Topic Vocabulary:
  • Anticipation
  • Significant
  • Conversion
  • Commercial activities
  • Expansion
  • Enhancing
  • Bypassing
  • Congestion
  • Connectivity
  • Recreational area
  • Demolition
  • Infrastructure
  • Preservation
  • Public transportation hub
  • Encourage
What to do next:
Look at other essays: