Both diagrams show the transformation of Liveton docks between 1980 and now.
Overall
, It can be clearly seen that after the renovation, the functions were changed to be more activities center than before concluding 2 types of structures which are new buildings and converted buildings.
Linking Words
To begin
with, the warehouses were converted into education Linking Words
centers
, kid's playing areas, and apartments respectively. Change the spelling
centres
In addition
, the space between these 3 constructions and 2 cranes, the sailing club, hotel, and parking has been developed
The most noticeable additions are ships in the canal. there was transformed into a ship museum Linking Words
while
another 3 were removed.
The Liveton docks have been changed from the place keeping or repairing ships into a place that can support many modern activities. The circulation structures were built to connect each of these buildings together, Linking Words
however
, a flood barrier was constructed in the East to protect the flood problem from the coast.Linking Words
nine318