the map below shows an industrial area in the town of Norbition and planned future development of the site.
The two maps provide information about changes in an industrial site in the town of Norbition and projected future reconstruction of the area.
From the maps, it can be clear that the space saw spectacular development. There is no longer an industrial area
instead
, it has become a residential field.
In the planned future , there will be no factories and they will be replaced with houses. Shops have been opened to the southwest of the main Linking Words
square
Use synonyms
as well as
shops,and a medical centre has been set up to the southeast of the bigger Linking Words
square
. Use synonyms
in addition
to the main Linking Words
square
, a small roundabout has been constructed To the north of the main roundabout. Use synonyms
Moreover
, a bridge will be built across the river and will connect the farmland and site to each other. To the northwest of the big Linking Words
square
, a new way and some apartments are made. the east side of the area has significantly developed and a playground is constructed for children to play there and a school has been built for children’s education.Use synonyms
Submitted by TUTOO on
Unauthorized use and/or duplication of this material without express and written permission from this site’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Writing9 with appropriate and specific direction to the original content.
Vocabulary: Replace the words square with synonyms.
▼
Vocabulary: The word "maps" was used 2 times.
▼