Overall
, there are 5 steps and 4 resources in manufacturing electricity in geothermal power Linking Words
plant
.
Fix the agreement mistake
plants
However
, there is cold water, which is pumping down to the 4.5km depth, Linking Words
then
a liquid Linking Words
is going
to the injection well process after Wrong verb form
goes
it's coming
through Wrong verb form
it comes
Geometral
zone( hot rocks) to the production well, Correct article usage
the Geometral
due to
hot water is pumping up Linking Words
rigt
to the condenser.
Because of the condenser equipment generated steam goes exactly to the turbine and makes it Correct your spelling
right
to
rotate, Fix the infinitive
apply
as a result
, the generator creates energy powered by the previous machinery. Linking Words
Finally
, the manufactured electricity is Linking Words
delivering
to consumers by Wrong verb form
delivered
the
special lines. Correct article usage
apply
This
is a Linking Words
repetative
process.Correct your spelling
repetitive
interclass1982