The diagrams depict both the current and projected future
water
supply infrastructure in Australia, as recorded on October 10th, 2015.
The overarching objective of the plan is to enhance the management of wastewater and potable Use synonyms
water
through advanced utilization of Use synonyms
water
treatment Use synonyms
facilities
, alongside a redirection of stormwater disposal.
Currently, contaminated Use synonyms
water
originating from households, shops, and factories in urban areas is conveyed to filtration Use synonyms
facilities
, Use synonyms
while
purified Linking Words
water
is directly supplied from storage to designated regions. Use synonyms
Additionally
, stormwater from the area is discharged directly into the river, as indicated in the diagrams.
Proposed future modifications aim to mitigate issues associated with waterway pollution by redirecting urban stormwater to purification Linking Words
facilities
Use synonyms
instead
of releasing it into natural watercourses. Linking Words
Furthermore
, reclaimed Linking Words
water
from the processing Use synonyms
facilities
will be Use synonyms
channeled
back into urban usage for daily activities.Change the spelling
channelled
Writing8