The diagram below illustrates the process where bricks are made for the building industry. Summarie the information by selecting and reporting the main features, and make comparisons where relevant.
This
diagram depicts how bricks
were made for the building industry. The process has seven main steps, starting with clay in the ground by a digger and finishing with the packaging being delivered to the building industry.
To begin
with, a digger digs a large amount of clay from the ground. Second,
using a metal grid on a roller system, then
mixed with sand and water. After that, the mixture is formed into two shapes, which are a wire cutter or a mould.
Furthermore
, the bricks
could spend 1-2 days drying off in an oven before being moved through a high-temperature kilns
that the Correct the article-noun agreement
a high-temperature kiln
high-temperature kilns
bricks
will be moderate at 200-980 degrees Celsius, and the second step is even hotter, at 870-1300 degrees Celsius. When the second step is done, the bricks
go through a cooling chamber for 2-3 days. Finally
, it will be packed and delivered to the building industry.Submitted by napatnp18065322 on
Unauthorized use and/or duplication of this material without express and written permission from this site’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Writing9 with appropriate and specific direction to the original content.
Conclusion: The conclusion is too long.
Vocabulary: Rephrase your introduction. Words match: 67%.
▼
Vocabulary: Replace the words bricks with synonyms.
▼
Vocabulary: Only 5 basic words for charts were used.
▼
Essentional vocabulary list for IELTS Writing 7+
Learn how to write high-scoring essays with powerful words.Download Free PDF and start improving you writing skills today!