The maps illustrate changes in the site of a
school
between 2004 and 2024.
Overall
, the main change in 2024 is the construction of a new school
building and facilities to accommodate the significantly larger student population, and
minor changes to the sports field and increased parking.
In 2004, the Correct word choice
apply
school
could accommodate 600 students. There was only one car park in front of the school
main entrance, two Change noun form
school's
school
buildings that were not connected to each other, and a big field for sports in the north-east of the site.
In 2024, the new building for additional
400 students will be built on the site of the sports field, which will be moved to the south and will become smaller than its previous size. Correct article usage
an additional
School
buildings one and two will be connected to each other. There will also
be an additional parking space in the west of the new building.Submitted by aldiyarov.e on
Unauthorized use and/or duplication of this material without express and written permission from this site’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Writing9 with appropriate and specific direction to the original content.
Basic structure: Change the third paragraph.
▼
Vocabulary: Replace the words school with synonyms.
▼
Vocabulary: Rephrase the word "changes" in your introduction.
▼
Vocabulary: Only 6 basic words for charts were used.
▼
Vocabulary: The word "changes" was used 3 times.
▼
Vocabulary: Use several vocabularies to present the data in the third paragraph.
▼