The two site plans present the current situation of Bunborough Village and its development plan for 2024. On
this
day, Bunborough has houses, shops, and a fishing port. Linking Words
Overall
, it can be seen that most of the construction will be done in the east part of the centre.
The most noticeable difference is the construction of the train railway which stretches from the northeast to the south side of the area. Linking Words
Furthermore
, in 2024, there will be a train station to support the citizen's commutation. Linking Words
Due to
Linking Words
this
event, one house in the top northeast will be destroyed and two others will be relocated. Linking Words
Also
, another road will be constructed to cut the travelling time from Lynwich to Bunborough and vice versa.
Linking Words
Moreover
, the shopping area will remain the same. There will be a change on the seafront where the fishing port will be replaced with a promenade. Linking Words
In addition
, two hotels will be built, one on the north side of the sea and the other on the south part near the beach.Linking Words
Submitted by larasati.sylvia41 on
Unauthorized use and/or duplication of this material without express and written permission from this site’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Writing9 with appropriate and specific direction to the original content.
Introduction: The introduction is missing.
▼
Introduction: The chart intro is missing.
▼
Introduction: The chart intro is missing.
▼
Vocabulary: Only 4 basic words for charts were used.
▼