The flow chart shows the
poccess
of the geothermal power plant. It has 6 important facilities called Correct your spelling
process
Cold
Correct your spelling
Coldwater
water
, the injection well, the production well, Use synonyms
condenser
, Correct article usage
the condenser
Use synonyms
turbine
and Correct article usage
the turbine
Correct article usage
the genarator
genarator
.
First of all, there was a pool used for Correct your spelling
generator
storaging
the cold Correct your spelling
storing
water
. Use synonyms
Secondly
, the cold Linking Words
water
Use synonyms
pumped
down Add a missing verb
was pumped
in
the injection well which was built 4.5km beneath the ground. Change preposition
into
Thirdly
, Linking Words
Use synonyms
water
passed by the Add an article
the water
geothermial
zone, it was a place surrounded by plenty of hot rocks. After Correct your spelling
geothermal
Use synonyms
water
reacted Correct article usage
the water
absolutly
with the hot rocks, the Correct your spelling
absolutely
tempreture
of Correct your spelling
temperature
Use synonyms
water
rose a lot, and Correct article usage
the water
water
arrived at the production well. Use synonyms
Forthly
, the condenser will Correct your spelling
Fourthly
storage
the hot Replace the word
store
water
pumped up from the production well and Use synonyms
expressed
steam to the Wrong verb form
express
turbine
. At Use synonyms
last
, the Linking Words
steam powered
the Add a hyphen
steam-powered
turbine
, the Use synonyms
turbine
Use synonyms
spinned
so fast and the Correct your spelling
spun
turbine
Use synonyms
also
powered the generator, the generator operated and produced electricity. The generator transmitted electricity Linking Words
in
the tower.Change preposition
to
fiasngs