The two diagrams show the present layout of a college and a proposed redevelopment plan for 2025.
Overall
, the main changes include removing the garden and footpath, expanding the car park, building a shop, and increasing the number of classrooms. The road and bus stop in the south will stay the same.
At present, the garden is located in the north and is separated from the main building by a footpath. The car park is on the left-hand side, next to the bus stop and the road, and it has space for four cars. On the right side, there are the reception, library, and toilets, Linking Words
while
in the middle, there is a lunch area with three study rooms .
In the proposed plan, the garden and footpath will be removed so that the car park can be made bigger, almost twice its current size. A new shop will be built in the northern part, and the toilets will be moved next to it. The number of classrooms will increase from three to five, and the library will be moved to the southwest corner. The reception will Linking Words
also
change its shape and will be placed in the centre between two classrooms.Linking Words