The maps show two different underground tunnel systems for cars in two Australian cites.

The maps show two different underground tunnel systems for cars in two Australian cites.
IELTS Writing Task Chart for The maps show two different underground tunnel systems for cars in two Australian cites.
The maps illustrate the construction of two underground vehicle tunnels in Australia, with the first built between 1986 and 1998 and the second between 2002 and 2006.
Overall
Linking Words
, the two tunnels are considerably different, with the more recent one being larger, more advanced, and far more expensive to construct. The first tunnel was constructed from 1986 to 1998 and cost approximately $555 million. It measured 1.5 meters in height and 2.2 kilometres in length, allowing only two cars to travel side by side.
This
Linking Words
tunnel was
also
Linking Words
constructed through sand, running beneath a river, with the bridge situated above.
In contrast
Linking Words
, the second tunnel was built through stone and clay between 2002 and 2006. It was significantly more expensive, with a total cost of $1.1 billion. It was situated beneath a major two-way highway in the city centre with numerous public facilities nearby.
Moreover
Linking Words
,
this
Linking Words
underground was longer at 3.6 kilometres, and one metre deeper than the earlier project.
Additionally
Linking Words
, it was wide enough to accommodate three vehicles abreast.

Unauthorized use and/or duplication of this material without express and written permission from this site's author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Writing9 with appropriate and specific direction to the original content.

Vocabulary: Rephrase the word "undefined" in your introduction.
Vocabulary: Only 5 basic words for charts were used.
What to do next:
Look at other essays: