The maps show the changes that happened to a Science and technology museum for a 10-year period from 1996 to 2016.
Overall
, more facilities and exhibition rooms were added in 2016.
In 1996, a writing desk was located in the upper left corner of the map. But, it was replaced by computers in 2016. Linking Words
Also
, the print room and the library which were originally stationed in the middle of the building were replaced by a digital technology room and 3D cinema. The library was relocated to the upper middle corner of the 2016 map.
A solar wind area was built in 2016 at the right upper corner of the building, and just under that, there was a car park that seems to be smaller than previously as a bicycle park occupied the area that was originally for a car park only. There were Linking Words
also
changes to the cafe and reception. The cafe changed into a restaurant and the reception become a bit bigger.Linking Words
irarahmawati.polkesma