The diagrams below give information about two road tunnels in two Australian cities. Summarize the information by selecting and reporting the main features and make comparisons where relevant.
The pictures illustrate some different features of two tunnels located in 2 separate regions in Australia.
It is clear that
there are numerous differences between the two tunnels. Whereas
the old is not only shorter in terms of length, depth and duration of construction but also
cheaper, compared to the recent. Besides
, the former has fewer lanes for vehicles than the latter does.
As can be seen, the first tunnel was built in 12 years from 1986 to 1998 with a cost of 555 million dollars, while
it took only 4 years for the second one to be finished with a doubled expense of 1,1 billion dollars. Moreover
, as the older has only 4 lanes for travelling, the figure for the newer is more with 6 lanes.
In addition
, the old 1.5-meter-deep tunnel was constructed under the layer of sand and water in a curved shape with a length of 2,2 kilometres. Meanwhile, the new one which was 3,6 kilometres long and 2,5 meters deep was erected under a layer of stone and clay in a less curved form.Submitted by danphamngocha on
Unauthorized use and/or duplication of this material without express and written permission from this site’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Writing9 with appropriate and specific direction to the original content.
Introduction: The introduction is missing.
▼
Introduction: The chart intro is missing.
▼
Basic structure: Change the fourth paragraph.
▼
Introduction: The chart intro is missing.
▼
Vocabulary: Only 4 basic words for charts were used.
▼
Vocabulary: Use several vocabularies to present the data in the fourth paragraph.
▼