The given pictures illustrate the campus of a school in 2004 and its planning development in 2024.
Overall
, there will be significant changes to Linking Words
this
educational complex after 2 decades, in which, the building constructions will be noticeably expanded Linking Words
while
the green areas will be narrowed, and the sports ground will be moved to another place and downsized. Especially, there will be more changes to the right part compared with the left one and the number of students after expanding will be nearly double compared with before.
Looking at the left half, from school building 2 to the left of the picture in 2004 and 2024, there will not be so many changes, just Building 1 and 2 will be connected into one block, and Linking Words
therefore
, the path between the two buildings will be removed. Linking Words
In addition
, a road will be constructed from the main entrance and go between building 2 and the green park to the right side.
Linking Words
However
, the right section of the site in 2024 will witness more developments than the left. Linking Words
Firstly
, the sports field will be moved to inside the big park nearby and be scaled down noticeably, to about 40% of the original size, and alternatively, the place that it used to be located will be replaced with a new educational construction named School Building 3 and another new parking lot called car park 2. Linking Words
Finally
, there will be a path connecting Building 1 and 2 with Building 3.Linking Words
hoangdaosales