The diagrams below show the changes that have taken place at West Park Secondary Schools since its construction in 1950. Summarise the information by selecting and reporting the main features and make comparisons where relevant.
#diagrams #show #changes #place #west #park #schools #construction #summarise #information #features #comparisons
The given diagrams demonstrate the adjustments at West Park Secondary Schools from the date it was built .
Overall
, It is notable that the remodelling took place in all the buildings except for two areas. Moreover
, the school's main building and the playground remained the same since the opening of the school.
In 1980, what was previously known as the area of the houses was replaced by the
car park and a science block. Correct article usage
a
Furthermore
, the school building was separated into the main building and the science block. Lastly
, the farmland became a sports field and the playground stayed the same.
In 2010, it is obvious that there was an extension for the parking lot which took the location of the sports place this
led to minimising the size of the sports domain. Additionally
, this
also
resulted in cutting some area for the playground which made it lose about one-third of its space.Submitted by amanihejji on
Unauthorized use and/or duplication of this material without express and written permission from this site’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Writing9 with appropriate and specific direction to the original content.
Introduction: The introduction is missing.
▼
Introduction: The chart intro is missing.
▼
Introduction: The chart intro is missing.
▼
Vocabulary: Only 5 basic words for charts were used.
▼