The given diagrams demonstrate the adjustments at West Park Secondary Schools from the date it was built .
Overall
, It is notable that the remodelling took place in all the buildings except for two areas. Linking Words
Moreover
, the school's main building and the playground remained the same since the opening of the school.
In 1980, what was previously known as the area of the houses was replaced by Linking Words
the
car park and a science block. Correct article usage
a
Furthermore
, the school building was separated into the main building and the science block. Linking Words
Lastly
, the farmland became a sports field and the playground stayed the same.
In 2010, it is obvious that there was an extension for the parking lot which took the location of the sports place Linking Words
this
led to minimising the size of the sports domain. Linking Words
Additionally
, Linking Words
this
Linking Words
also
resulted in cutting some area for the playground which made it lose about one-third of its space.Linking Words
amanihejji