The given diagram illustrates the process of producing
electricity
via geothermal energy usage. Use synonyms
Overall
, it can be observed that there are 5 steps of how Linking Words
electricity
is generated, beginning with storing cold Use synonyms
water
in a container and finishing with generating Use synonyms
electricity
.
The initial step focuses on preparing Use synonyms
the
cold rain. Change preposition
for the
Firstly
, Linking Words
this
Linking Words
water
is pumped down underground through a long pipe and Use synonyms
then
is given to an injection well. Linking Words
Next,
the cold Linking Words
water
moves to the geothermal zone Use synonyms
Linking Words
whereas
there are hot rocks before being conveyed into a production well. After that, hot Correct word choice
where
water
is pumped up the ground, thereby being sent to a condenser to complete the first stage.
Preparing the hot Use synonyms
water
is the focus of the following stage. In Use synonyms
this
condenser, steam is produced and is conveyed into another tank. The turbine will receive steam to turn and the result is sent to the generator afterwards. At Linking Words
this
stage, Linking Words
this
machine converts steam into Linking Words
electricity
before being provided for Use synonyms
a
electric tower.Change the article
an
AE Gay lord