The two maps illustrate the layout of Southwest Airport at present and its planned development, which will take place after
year
.
In general, what stands out from the figure is that the placement of Add an article
a year
airport
will expand significantly and new facilities will be added for passengers.
Correct article usage
the airport
Firstly
, Linking Words
it is clear that
the number of gates will Linking Words
install
from 8 to 18 and will Wrong verb form
be installed
build
in the Y-shape. Wrong verb form
be built
Moreover
, Linking Words
Sky
train will be added in the middle of Correct article usage
a Sky
gates
Correct article usage
the gates
fo
Correct your spelling
to
connecting
them.
Wrong verb form
connect
Secondly
, the shops will be placed before Linking Words
Correct article usage
the secity
secity
and passport control zone. In the left-hand corner of the Correct your spelling
security
departures
the bag drop zone will be Add a comma
departures,
arrangged
for the convenience of people. Correct your spelling
arranged
In addition
, Linking Words
in
the opposite check-in desk will be placed. As for the cafe, it will be replaced under Change preposition
apply
of
the bag Change preposition
apply
drops
place.
New facilities Change the noun form
drop
such
as an ATM and car hire service will be located Linking Words
in
the right-hand of the arrival sections.
In conclusion, the Southwest Airport will expand significantly, increasing the number of Change preposition
on
fasilities
Correct your spelling
facilities
such
as an ATM, car hire service, and shops.Linking Words
shani.menglieva.94