The diagram illustrates how geothermal
used
to Verb problem
is used
produced
electricity,showing the different stages involved in the Wrong verb form
produce
process
.Use synonyms
This
report aims to summarise the key trends,significant comparisons and notable changes highlighted in the data.
Linking Words
Overall
,the Linking Words
process
consists of five main stages ,beginning with cold water and ending with Use synonyms
generator
turbine .It is a cyclical Add an article
the generator
process
Use synonyms
,
in which the material goes through several stages before Punctuation problem
apply
the material
is ready to be used.
Correct pronoun usage
it
At the first stage
,the cold water Linking Words
pumped
down.Verb problem
is pumped
Following
Linking Words
this
,the material injects well .After that ,the material goes Linking Words
thourgh
the geothermal zone ,so that the material products well.Once Correct your spelling
through
this
stage has been completed ,Linking Words
The
hot water Fix capitalization
the
pumped
up to the condenser.
In the following stage,the material Verb problem
is pumped
powerd
by steam.Verb problem
is powered
Subsequently
,the material Linking Words
powerd
by Wrong verb form
is powered
turbine
and produces electricity .Add an article
a turbine
Fianlly
,the material goes through the Correct your spelling
Finally
elecrtic
tower,Correct your spelling
electric
thus
completing the Linking Words
process
.Use synonyms