These days,
has increased and become a critical problem for the nation as well as individuals.
, there are split opinions regarding how to mitigate
issue. Some people believe that authorities need to invest funds in developing training and subway lines to diminish
while another group of thinkers argues that
problem could be solved by constructed to extend roads.
, both have their pros and cons.
, before commenting on my decision, both views would be discussed.
On the one hand, there are several reasons why people think that the government necessarily spend
on constructing train and underground ways lines to tackle
jam problems. The
and foremost one is that public transports save time and
, which gravitates the attraction of people toward these facilities.
, individuals prefer these
means of transport
of using their vehicles,
, the bottlenecks of
cut down quickly.
,
people have their separate transportations, they choose public transports
as trains and subways, to reach fast and save
.
, another reason is that underground transport ways no requirement to worry about the scarcity of land.
,
works as an
of travelling. In
,
could be diminishing.
, there are clear reasons why the extension and construction of highways can alleviate the volume of
.
with, at present accessible paths are not enough to accommodate the number of vehicles on it.
, there are possibilities that a wider range of roads help to control
jam problems, by providing appropriate wider constructed roads.
, people have enough space on the roads to drive their vehicles,
as cars, bikes, trucks, and many more.
,
solution helps individuals to reach quickly at their destination without any disturbance or restriction.
, different
branches of roads help to the public to select the best
to reach their works by private vehicles if there is any crowd or
occurs. For these reasons, some people choose
to reduce
.
In conclusion, there are debatable arguments for and against to mitigate
jam causes.
, I believe that constructing more and wider roads reduces
, but it is a temporary solution, so that the government should allocate funds to build train and subway lines
of investing
on roads.