The maps below show the changes in a town after the construction of a hydroelectric power dam.

The maps below show the changes in a town after the construction of a hydroelectric power dam.
The maps illustrate what the layout of a local area looked like before and after a hydroelectric power dam was erected in 2010.
It is clear that
there are various striking transformations. All of these
such
as the removal of forest and the appearance of a hotel
as well as
some power plants make the town become more modern. As can be seen, in 1990, a river was situated in the middle of the town from the north to the south. On the left side of it, there was an ancient-architecture building and a forest which was the habitat for numerous rare animals
together with
plants. On the opposite side, irrigated farmlands
along with
villages were located between ranges of mountains. In 2010, as a dam was constructed crossing the river, a human-made lake was erected in the north.
Also
, a hotel appeared in the eastern part of the region to meet people's needs.
While
the river was still in its old position, the farmlands on the right and those eco-friendly parts on the left were removed.
Instead
, a number of power plants were installed on either side of the flow.
Submitted by danphamngocha on

Unauthorized use and/or duplication of this material without express and written permission from this site’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Writing9 with appropriate and specific direction to the original content.

Vocabulary: Only 3 basic words for charts were used.
Vocabulary: Use several vocabularies to present the data in the second paragraph.
Vocabulary: Use several vocabularies to present the data in the third paragraph.
What to do next:
Look at other essays: