The maps below show an industrial area in the town of Norbiton, and planned future development of the site. Summarise the information by selecting and reporting the main features, and make comparisons where relevant

The maps below show an industrial area in the town of Norbiton, and planned 

future development of the site.

Summarise the information by selecting and reporting the main features, and 

make comparisons where relevant
The maps indicate the region in
Norbiton
with factories and the initiative plan from its government for the future.
Norbiton
currently consists of two main areas, the township itself and the farmland which is located in the north of the river. Nowadays,
Norbiton
is an industrial area but it will change in the future based on the future development plan, which will convert the region into a suburban. The number of industries in
Norbiton
now is 8 factories.
Additionally
, those plants are concentrated only in the town, along the roadway that connects the area with the outside.
In contrast
, the farmland is disconnected from the main town by a river
thus
it is not developed at all. A new plan has been initiated by the government that will evolve the Nortbiton into a typical suburb. There will be a new roundabout that connects the main avenue in the metropolis with the road that connects the city and its neighbouring municipality.
In addition
, a new medical centre and shops will be built around the main roundabout. The plants that are located in the east of the town will be demolished and a few new housing
Add the comma(s)
, as well as a school and playground,
show examples
as well as
a school and playground will be constructed in it.
Furthermore
, a new route will be constructed in the northwestern part of the city. It will connect another residence to the main roundabout.
Besides
, there will be a new bridge that can be used by the citizens of
Norbiton
to go to the farmland.
Moreover
,
this
part of the city will
also
be developed into dwellings.
Submitted by rianadmaja on

Unauthorized use and/or duplication of this material without express and written permission from this site’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Writing9 with appropriate and specific direction to the original content.

Common mistake: Your writing should be 150-250 words.
Vocabulary: Replace the words norbiton with synonyms.
Vocabulary: Only 5 basic words for charts were used.
Topic Vocabulary:
  • industrial area
  • planned future development
  • factories
  • warehouses
  • railway line
  • shopping center
  • residential buildings
  • college
  • mixed-use zone
  • commercial
  • residential
  • educational
  • green spaces
  • pedestrian walkways
  • housing
  • community
  • retail services
  • revitalize
  • quality of life
  • vibrant
  • sustainable
What to do next:
Look at other essays: