The maps show how the Science and Technology
museum
site was re-developed in the 20-year period between 1996 and 2016. Capitalize word
Museum
Overall
, the site expanded its facilities and exhibits, with key changes seemingly designed to update the museum for the 21st century.
The modernisation of the museum can be seen in a number of ways. In terms of exhibits, the writing desks, diesel engine exhibition, and print room were replaced by computers, electrical cars and a digital technology room respectively. Linking Words
In addition
, a new VR room, 3D cinema and solar wind Linking Words
area
were added to the site. In fact, the only exhibit Use synonyms
area
that remained in the same location was the steam engine exhibition.
In terms of public facilities, most were retained, but the library was Use synonyms
re-located
to slightly north of its original position, the reception Correct your spelling
relocated
area
stayed where it was but was expanded, and the café Use synonyms
area
was converted into a restaurant. The car park remained in its original position, but its lower portion was rebuilt as a bicycle path.Use synonyms
aakbarov2010