The first graph gives the number of passengers travelling by train in Sydney. The second graph provides information on the percentage of trains running on time. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The first graph gives the number of passengers travelling by train in Sydney.

The second graph provides information on the percentage of trains running on time.

Summarise the information by selecting and reporting the main features, and make comparisons where relevant.
The line charts illustrate the traveller numbers commuting by
train
and the proportion of on-time
train
arrivals in Sydney between the years 1995 and 2004.
Overall
, it is obvious that the figure for commuters using
this
kind of public transport reveals an upward trend over the 9-year period,reaching a peak in 2001.
Conversely
,it displays a downward shift in the percentage of
train
punctuality with regard to the second diagram. An increase in passengers could potentially lead to more delayed trains if the infrastructure is not equipped to handle higher traffic.
According to
the number of public transportation passengers in
this
city, the total of commuters started at 250 million and gradually rose until peaked at 300 million by 2001,with a slight decline over the following years
as well as
accounting for just under 280 million
at the end
. Regarding the performance of
train
arrivals, it began at approximately 93% of the on-time approach and
then
modestly dropped until the year 1997. One noticeable feature of the data is that the fraction of
this
performance shows a fluctuation over the period and plummeted by one-fifth of the total at the final,varying from over 90% to around 73%.
Submitted by phanphetpor on

Unauthorized use and/or duplication of this material without express and written permission from this site’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Writing9 with appropriate and specific direction to the original content.

Vocabulary: Replace the words train with synonyms.
Topic Vocabulary:
  • passenger volume
  • trend
  • peak times
  • off-peak times
  • punctuality
  • infrastructure
  • correlation
  • traffic
  • delays
  • satisfaction
  • efficiency
  • transportation system
  • reliability
  • urban mobility
  • capacity
What to do next:
Look at other essays: