The process diagram depicts the
the
process of Remove the redundancy
apply
Use synonyms
bricks
manufacturing in the building industry.
Fix the agreement mistake
brick
Overall
, brick Linking Words
prodcution
is a Correct your spelling
production
liner
process consisting of seven Correct your spelling
linear
kay
stages. It begins with digging the Correct your spelling
key
clay
and it ends with delivering the processed brick to the customers.
Use synonyms
First,
Linking Words
clay
is Use synonyms
digged
by using an excavator, after Correct your spelling
dug
Use synonyms
clay
has Correct article usage
the clay
sent
to a conveyor roller which contains a metal grid. After being added the sand and water to the Add a missing verb
been sent
resisual
Correct your spelling
residual
clay
particles, the mixture Use synonyms
is send
to either Change the verb form
is sent
wire
cutting or moulding cavity. Correct article usage
a wire
As a result
, Linking Words
block
of Correct article usage
a block
bricks
can be obtained.
In the subsequent stage, a stack of Use synonyms
bricks
Use synonyms
are
kept inside an oven. After keeping the stack in the oven for 24 to 48 hours, Change the verb form
is
while
dying Linking Words
is
Unnecessary verb
apply
moister
contamination is taken out from the product, Replace the word
moisture
it
is sent to a klin where Correct word choice
and it
futher
heating is done. Inside the klin moderate drying Correct your spelling
further
is taken
Wrong verb form
takes
placed
Replace the word
place
while
Linking Words
,
it is heated Remove the comma
apply
upto
200 to 980 degrees Correct your spelling
up to
of
Change preposition
apply
celciues
. Before, the end product Correct your spelling
celsius
being
sent Wrong verb form
is
in to
a cooling chamber, it is Join the words
into
futher
heated to Correct your spelling
further
higher
temperature Correct article usage
a higher
Change preposition
of upto
upto
870 to 1300 Correct your spelling
up to
celcius
. After keeping the stack of Change the capitalization
Celcius
bricks
for 2 to 3 days, it is packaged. Once the packaging has Use synonyms
completed
, as the final step, the end product is delivered to the end customers.Add a missing verb
been completed
chamod20