The diagram illustrates producing electricity from geothermal energy
used
. Correct word choice
apply
Overall
, its begin with cold Linking Words
water
storage and Use synonyms
end
up with Correct subject-verb agreement
ends
generator
turbine. Correct article usage
a generator
This
diagram Linking Words
have
five main stages Correct subject-verb agreement
has
both
Punctuation problem
, both
of
mechanical and physical Change preposition
apply
Linking Words
such
as injection,production,condenser, and generator.
Punctuation problem
, such
To begin
with, Linking Words
first
stage was the storing of cold Correct article usage
the first
water
Use synonyms
and
Punctuation problem
, and
then
cold Linking Words
water
was pumped down by 4.5 km to the injection Use synonyms
welll
. After which was the cold Correct your spelling
well
water
that was pumped down Use synonyms
going
to Verb problem
apply
geothermal
zone Correct article usage
the geothermal
which
was hot rocks. Punctuation problem
, which
Then
, go to next process was the production well.
Linking Words
Addionally
, from the production Correct your spelling
Additionally
well
the result was hot Punctuation problem
well,
water
Use synonyms
latter
pumped up to condensor and from condensor hot Use the right word
later
water
will be steam and Use synonyms
then
Linking Words
turbine
Correct article usage
the turbine
which
Punctuation problem
, which
powered
by steam and Verb problem
is powered
then
Linking Words
generator
Correct article usage
the generator
which
Punctuation problem
, which
powered
by Verb problem
is powered
turbine
and produces electricity.Correct article usage
the turbine