The flow chart shows the way in which
course
are made for the building industry.
Fix the agreement mistake
courses
Overall
, there are 7 stages in the whole brick-producing action, beginning with the digging up of brick and ending with the delivery of the trail to the customers.
Linking Words
To begin
, the terra cotta used to make the path is dug up from the ground by a large digger. Linking Words
This
earth is Linking Words
then
placed onto a metal grid, which is used to break up the mud into smaller pieces. A roller assists in Linking Words
this
case. Linking Words
Following
Linking Words
this
, sand and water are added to the earth, and Linking Words
this
mixture is turned into Linking Words
track
by either placing it into a mould or using a wire cut. Add an article
the track
a track
Next,
these Linking Words
path
are placed in a drying oven to dry for 24 - 48 hours.
In the subsequent stage, the street Change the determiner
paths
go
through a heating and cooling development.
They are heated in a kiln at a moderate and Change the verb form
goes
then
a high temperature (ranging from 200c to 1300c), followed by a cooling measure in a cooling chamber for 48- 72 hours. Linking Words
Finally
,
the Linking Words
track
are packed and delivered to their destinations.Fix the agreement mistake
tracks
quynhtranhbh