The two maps below show the village of Bunborough in the present day and plans for the village in 2024. Summarise the information by selecting and reporting the main features and make comparisons where relevant. Write at least 150 words.
Illustrated in the maps are the current village known as Bunborough and its proposed changes which are
due to
finish by Autumn 2024. A discernible transformation is expected in the area, aimed at diversifying its economic base and improving transportation infrastructure, Linking Words
along with
the relocation of certain households. Notably, the existing shops and beachfront will remain unchanged.
A central proposed feature of the village is a new road and Linking Words
trainline
, whose station is Correct your spelling
train line
training
in
the outskirts of the village, and they will follow the north-south route to Lynwich. Concerning the northern side of the map, Autumn 2024 will Change preposition
on
also
see the demolition of some houses near the station to relocate them to the other side of the railway.
Moving onto the south, it is Linking Words
vivid
that the fishing ports will undergo a reduction from three to only one port to make way for the new promenade. Beside Correct word choice
clear
this
new infrastructure would be a new hotel, which is planned to be constructed Linking Words
together with
another branch adjacent to the beach below it.Linking Words
Submitted by Nghỉ hè vui vẻ cả nhà on
Unauthorized use and/or duplication of this material without express and written permission from this site’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Writing9 with appropriate and specific direction to the original content.
Introduction: The introduction is missing.
▼
Introduction: The chart intro is missing.
▼
Introduction: The chart intro is missing.
▼
Vocabulary: Only 6 basic words for charts were used.
▼
Vocabulary: The word "maps" was used 2 times.
▼